Structural Steel Fabrication – Meeting Codes and Deadlines
Share
Client: Commercial Construction Fabricator, Northeast USA
Challenge:
The fabricator needed a filler metal meeting AWS E8018-C3 requirements for welding high-strength steel in a multi-story building project. Their issue was sourcing consistent quality and on-time deliveries during a tight project deadline.
Solution:
Xycore Inc supplied BLUME® E8018-C3 Electrodes, ensuring compliance with AWS standards and direct warehouse distribution from Georgia to minimize shipping delays.
Results:
-
Project completed 2 weeks ahead of schedule.
-
Weld inspections met AWS D1.1 structural welding code with zero failures.
-
Supply chain efficiency from Xycore warehouses eliminated downtime.
Customer Quote:
“Partnering with Xycore Inc gave us confidence. BLUME® electrodes not only performed flawlessly but were always in stock, saving us from project delays.”